Guide 3 of 6 · Bayside, Canada Bay
Skip bins in Bayside and Canada Bay
Both councils need their approval for a skip on the road or verge, and neither needs anything for a skip kept wholly on your own property. Bayside spells out sizes, documents and daily fees, with the application fee waived for a single home for up to five days; Canada Bay issues its permit a week at a time, with a bond you get back.
General information from each council’s own page as read on 9 October 2026, not advice about your street. Your council is the place to check.
Bayside
What Bayside approves
Bayside Council needs its approval for a skip bin, or anything else that is not a registered vehicle, placed on public land such as a roadway or verge. A skip placed completely within your property needs no permit.
Each application is weighed on its own, balancing the work being done against everyone else who uses the road, and Council may refuse any of them. Its page sets the largest skip it will allow in each place.
| Where | Longest | Widest | Also |
|---|---|---|---|
| Footway or grass verge | 7.0 m | 2.5 m | At least 1.5 m left clear on either side for people walking. |
| Road | 7.0 m | 1.7 m | Must not stick out into the traffic lane or block water running along the gutter. |
On the road, a skip is allowed only where a car could legally park under the Road Rules 2014, signposted or not, and it must sit parallel to the kerb. Council will not approve a proposal that could put people at risk of injury, blocks emergency vehicles, or fails to keep safe access for people and vehicles. It will not issue permits for shipping containers or storage pods on the roadway or nature strip.
What goes with the application
- Location plan
- A diagram of your property showing where the skip will go on Council land or the roadway, and its size.
- Insurance
- A certificate of currency naming the proposed permit holder as the insured, for public liability of no less than $20,000,000, and expiring at least three months after the proposed finish date of the work. Council’s page says your skip supplier can provide it.
- Traffic plan
- A traffic management plan prepared by a person accredited by Transport for NSW, meeting its Traffic Control at Work Sites Manual guidelines, AS 1742.3 and Work Cover NSW regulations.
- State roads
- On a classified state or regional road, a Road Occupancy Licence from Transport for NSW.
The state roads rule reaches a little further than the road itself. If the skip is on, or within 100 metres of, a classified state or regional road, or within 100 metres of traffic lights, nothing can start until a Road Occupancy Licence has been obtained from the Traffic Management Centre.
Fees, as at 9 October 2026
| Fee | Amount | Charged |
|---|---|---|
| Application fee | $355.00 | Per application; a single dwelling is exempt for up to 5 days. |
| Occupancy, skip under 2.5 cubic metres | $23.00 | Per day. |
| Occupancy, skip over 2.5 cubic metres | $46.50 | Per day. |
The waiver is the part most households will notice. A skip for a single dwelling is exempt from the application fee for up to five days, though occupancy fees still apply; past five days, both are charged. Apart from single dwelling applications, the application fee is required at lodgement, cannot be refunded, and must be paid before assessment begins.
Assessment takes at least 10 working days, and longer for large works or on classified roads. Lodging an application is not a permit: the permit is issued only after assessment and approval, once any fees owing are paid in full.
City of Canada Bay
A week at a time, with a bond
The City of Canada Bay needs its approval for a skip on Council property, which its page explains means the road. A skip on private property needs no application and no notice to Council.
- Lodge the formApproval comes from lodging Council’s Skip Bins on Public Land Application Form and paying the fees.
- One week at mostEach permit covers a skip for no more than a week at a time.
- Three kinds of chargeThe fees, set out on the form itself, are an application fee, a daily fee and a refundable bond.
- The bond comes backCouncil refunds it after inspecting the spot once the skip has gone.
The two councils side by side
Both councils leave a skip on private land alone, and both want an application for one on the road. Where they differ is in how they measure time and money. Bayside charges by the day, with its fee waiver for a single dwelling counted in days too; Canada Bay grants a week at a time and holds a bond until it has inspected the spot.
The other councils in these guides measure differently again. On the North Shore, Hunter’s Hill charges by the week and Willoughby’s rental covers three days, and the guide to a skip on the road lines up every council’s time limits. The permit guide covers Burwood, which asks for an approved provider instead of a permit.
In Bayside, the paperwork also leans on the skip business: Council’s page says the insurance certificate it needs can come from your skip supplier.